Wow, we're already at week there smack dab in the middle of the ORC. 

I have some key things accomplished thanks to my hubby and the kids.

The penny floor was installed and the walls and trim are painted.

4,100 pennies were individually glue to the floor.  Next it will grouted, then epoxy will be added.

That sounds like almost everything, but nope. There is so much more to do. 

Wait a minute! A big snaffoo happened.

While my husband was painting the powder room, I decided to take a shower in the master bathroom. 

We discovered the shower has been leaking down into the powder room. Oh my!!!

Noooo! 

We are going to have it checked out and really hope it's nothing major because we were on a serious roll. 

I'm glad the leak was discovered before we added the clear epoxy to the floor. That would have been a BIG disaster.  

We painted the walls white, the trim black, and installed the pennies on the floor. 

Here's the pic of the progress this far.

upload.jpg
upload.jpg

Things to be done:

*************get leak fixed ASAP***********

-ceiling/wallpaper

-lighting  

-fixtures

-artwork

-shelves

-mirror

-accessories

-finish flooring  

-more painting

Goals for week 4

-select and purchase accessories

-complete artwork

-select mirror

-complete all painting  

-grout floors

Without the leak fixed the flooring can not be completed because the adhesive won't stick.  Therefore the epoxy and grout can't be added. :( 

Keeping my fingers crossed because we have to wait on the builders to repair the problem.  

This is a TRUE one room challenge, but what's a challenge without a few obstacles thrown your way!!